DSpace Repository

Establish the Value Stream Mapping For Lead Time Evaluation by Lean Concept

Show simple item record

dc.contributor.author Pandya, Nirali
dc.contributor.author Dhruv, Ketan
dc.contributor.author Kikani, Pratik
dc.contributor.author Acharya, G.D.
dc.date.accessioned 2023-05-24T02:26:02Z
dc.date.available 2023-05-24T02:26:02Z
dc.date.issued 2017-02
dc.identifier.citation Nirali Pandya, Ketan Dhruv, Pratik Kikani, Dr. G. D Acharya (2017). Establish the Value Stream Mapping for Lead Time Evaluation by Lean Concept. International Journal of Advance Research, Ideas and Innovations in Technology, 3(1) www.IJARIIT.com. en_US
dc.identifier.issn 2454-132X
dc.identifier.uri http://10.9.150.37:8080/dspace//handle/atmiyauni/1043
dc.description.abstract Toyota started practicing TPS (Toyota Production System) since 1950 successfully. Due to success of TPS Many companies across the world stated using the same. Later in 1990s. M. Womak and Jones gave the name it as a lean manufacturing. Lean manufacturing is now one of the most powerful manufacturing systems in the Competitive world. Numerous organizations around the world have implemented and adopted it to enhance their productivity through reduction and elimination of Waste. This project reports is on understanding and implementation of one of the Lean tools which is; Value Stream Mapping, for Directional Control Valve in Bosch Rexroth (India) Pvt. Ltd. – Sanand Plant, Ahmedabad. Value Stream Mapping is a lean tool to identify the value added and non-value added activity during the production. Using this, identify the Waste and removing it along the processes which is based on the principle of Bosch Production System. (TPS – Toyota Production System) This intends the checking of the Inventory level during the process of Manufacturing and Assembling of the products. en_US
dc.language.iso en en_US
dc.publisher International Journal of Advance Research, Ideas and Innovations in Technology. en_US
dc.subject Toyota en_US
dc.subject Lean Principles en_US
dc.subject Muda en_US
dc.subject JIT en_US
dc.title Establish the Value Stream Mapping For Lead Time Evaluation by Lean Concept en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account