DSpace Repository

Productivity Improvement Of Exhaust Gas Recirculating (EGR) Elbow By Using Value Stream Mapping Of Lean Manufacturing

Show simple item record

dc.contributor.author Dabhi, Devendra M.
dc.date.accessioned 2024-02-21T06:28:03Z
dc.date.available 2024-02-21T06:28:03Z
dc.date.issued 2022-05
dc.identifier.citation Dabhi, D. M. (2022). Productivity Improvement Of Exhaust Gas Recirculating (EGR) Elbow By Using Value Stream Mapping Of Lean Manufacturing. Department of Mechanical Engineering Faculty of Engineering and Technology Atmiya University. en_US
dc.identifier.uri http://10.9.150.37:8080/dspace//handle/atmiyauni/1335
dc.description.abstract The manufacturing industry is adopting lean manufacturing practices. Many manufacturers struggle to produce a product, produce the right products or services in the right place and timely delivery meeting. To survive in today's competitive world, manufacturers need to come up with innovative ways reducing production lead times to improve productivity and performance goal. Today, it is aimed at improving production performance by reducing production lead time and dissipation of existing production the most important goals for almost every manufacturing company. Each industry's shop floor contains multiple stations that work together to complete specific activities according to a timetable in order to fulfill the production rate. Machine breakdowns, inventory shortages, and tool shortages all cause delays in meeting demand. The only lean tool recommended in the literature to eliminate Muda, or bottlenecks, across the manufacturing line is value stream mapping. Before implementing techniques, value stream mapping uses a current state map to record the current status of the production line. The main purpose of this study is to design Effective Value Stream Mapping (VSM) to improve productivity in automobile part manufacturer company in to reduce lead time and establish a future state for the action plan's process improvement to sum up, the proposed Future Value Stream Map (FVSM) aids in the effective identification of inefficient activities and industrial processes, according to this research. By lowering the manufacturing lead time, VSM serves as an input for improvement. In current state value stream mapping lead time is 7 Days. Applying lean concept in production area and calculate the lead time for Future state is 3.02 days. So reduce lead time by 3.97 days. en_US
dc.language.iso en en_US
dc.title Productivity Improvement Of Exhaust Gas Recirculating (EGR) Elbow By Using Value Stream Mapping Of Lean Manufacturing en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account