DSpace Repository

An Approach to Reduce Non-Value Added Time and Improve Process Cycle Efficiency by Implementing Project Information System

Show simple item record

dc.contributor.author Mehta, S.S.
dc.contributor.author Puranik, P.S.
dc.contributor.author Vaishnav, A.V.
dc.date.accessioned 2020-08-25T11:20:10Z
dc.date.available 2020-08-25T11:20:10Z
dc.date.issued 2017-04-01
dc.identifier.citation Mehta, S. & Puranik, P. & Vaishnav, A. (2017). An Approach to Reduce Non-Value Added Time and Improve Process Cycle Efficiency by Implementing Project Information System.International Journal for Research in Applied Science & Engineering Technology.5(4), 1107-1115.https://www.ijraset.com/archive-detail.php?AID=56 en_US
dc.identifier.issn 2321-9653
dc.identifier.uri https://www.ijraset.com/archive-detail.php?AID=56
dc.identifier.uri http://10.9.150.37:8080/dspace//handle/atmiyauni/572
dc.description.abstract This paper depicts how Project Information System was used to eliminate Non Value Added Time in a manufacturing plant. A current Process Cycle Efficiency was measured and data for constructing the present Process Cycle Efficiency was collected through production line visits, interviews of employees and observation of machine’s function at different production stages. Different causes of Non Value Added Time was determined. Regression analysis with the help of Minitab software were applied to evaluate most affected causes of Non Value Added Time. At present, Process Cycle Efficiency was found 63.47%. In order to improve Process Cycle Efficiency and to Reduce Non Value Added Time it was proposed to implement Project Information System, it was evaluated that future state Process Cycle Efficiency would be improved to 70.88% at initial stage. en_US
dc.language.iso en_US en_US
dc.publisher International Journal for Research in Applied Science & Engineering Technology en_US
dc.subject Process Cycle Efficiency, Non Value Added Time, Project Information System en_US
dc.title An Approach to Reduce Non-Value Added Time and Improve Process Cycle Efficiency by Implementing Project Information System en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account